Former Refuse Derived Fuel Boiler, Albany, New York

Project Location: Albany, New York

Project Highlights:

  • Deconstruction and removal of two 5-story boilers, precipitators, fly ash conveyors, and other associated components.
  • Work included controlled and systematic demolition utilizing torches, metal saws, interior cranes, and various other equipment.
  • Utilized 110,000 CFM HEPA filtered negative air machines for negative pressure to ensure no contaminants could escape the facility.