Sessler Environmental Services (SES) has a reputation for excellence that has been established throughout its decades of delivering client centered solutions.
In celebration of Spring showers, SES reflects on our recent Site Storm Drainage Improvement project done for a local processing facility.
This project posed significant challenges due to heavy rainfall causing standing water at the site.
PROJECT HIGHLIGHTS
• Excavation of a ½ acre stormwater retention pond.
• Relocated over 5,000 CY of soil.
• Installed a concrete sediment chamber and a concrete pump chamber.
• Installed an HDPE liner in pond.
• Installed over 300 LF of 12 HDPE drainage pipe with 7 storm inlets.
• Installed an HDPE liner in the drainage swale.
• Installed six check dams into the drainage swale