Grocery Store Fire Clean-Up

Project Location: Geneva, New York

Project Highlights:

  • Performed controlled demolition of a fire-damaged, condemned grocery store building containing asbestos.
  • Installed a cofferdam and diverted an active freshwater stream through piping during demolition to protect the waterway from contamination and debris.
  • Protected an adjacent home and its retaining wall from collapse during demolition activities.
  • Left the CMU single-story laundromat addition in place.
  • Backfilled the basement and regraded the entire site, leaving the area spanning the stream open.