Groundwater Treatment System Removal

Project Location: Fayette, Ohio

Project Highlights:

  • Removed six above-ground tanks ranging in capacity from 1,000 to 7,500 gallons.
  • Managed tank sludge in compliance with regulations as a listed hazardous waste.
  • Dismantled a groundwater treatment system designed for the remediation of TCE-contaminated groundwater.
  • Isolated the treatment system’s electrical supply from the existing facility’s electrical system.
  • Removed several thousand feet of conveyance piping from an active warehouse.
  • Disposed of the removed piping in compliance with regulations as a listed hazardous waste.
  • Performed work in an active facility.