Groundwater Treatment System Removal
Project Location: Fayette, Ohio
Project Highlights:
- Removed six above-ground tanks ranging in capacity from 1,000 to 7,500 gallons.
- Managed tank sludge in compliance with regulations as a listed hazardous waste.
- Dismantled a groundwater treatment system designed for the remediation of TCE-contaminated groundwater.
- Isolated the treatment system’s electrical supply from the existing facility’s electrical system.
- Removed several thousand feet of conveyance piping from an active warehouse.
- Disposed of the removed piping in compliance with regulations as a listed hazardous waste.
- Performed work in an active facility.